What is a 14 14 rotation schedule?
By Al Davies ยท Updated November 11, 2026
Short answer: A 14 14 rotation is a work plan where one crew works 14 days in a row, then has 14 days off, while a second crew covers the other half. Two crews keep the site staffed every day of the year.
What does the 28-day cycle look like?
| Days | Crew A | Crew B |
|---|---|---|
| 1 to 14 | On site | Off |
| 15 to 28 | Off | On site |
After day 28 the pattern starts over, so Crew A returns on day 29. Each crew works half of the year. The handover happens on days 14 and 15, when one crew arrives and the other leaves.
What hours does each crew put in?
That depends on the shift length. At 12 hours a day, a crew works 168 hours in 14 days, or 84 hours a week. Over 28 days the crew averages 42 hours a week.
Federal overtime rules count each workweek alone. The Department of Labor says time and a half is owed once a workweek passes 40 hours, and averaging hours over two weeks is not allowed. At 12 hours a day, that is 44 hours of overtime in a week for most hourly staff. Some work is exempt, and some states have extra rules, so check before you plan.
Why do remote sites use 14 14?
Sites that are far from home, such as camps, rigs and ships, make a daily commute impossible. A long block on site and a long block at home means fewer trips. The trade is long stretches away from family and little rest in the middle.
How do you plan the handover?
Overlap the crews for a day, or at least a shift, so the leaving crew can brief the arriving one. Write the overlap on the posted schedule, with the travel day included. Day 1 for a crew is often a travel day, not a full work day.
What about fatigue over 14 days?
NIOSH, part of the CDC, says long stretches of work days tend to build fatigue, most of all with shifts of 12 hours or more. A 14 day run is a long stretch, so plan lighter work in the last days of a run.
How do you post a rotation?
Give each crew a letter and write the on and off dates for the full year. For the layout of each week on site, use the basic scheduling steps and a printable weekly grid. Print the week by role with your events and a QR code. Printing also posts it to your team.
FAQ
How many crews does a 14 14 rotation need?
Two, each working half of the time.
How many hours is a 14 14 rotation?
At 12 hours a day it is 168 hours in 14 days, and a 42 hour average week over the full 28 days.
Is 14 14 the same as two weeks on, two weeks off?
Yes. They are two names for the same plan.
Do you get overtime on a 14 14 rotation?
Most hourly staff do, since each week over 40 hours is counted alone. Exempt roles are different.
Who uses a 14 14 rotation?
Remote sites such as camps, rigs and ships often do.
Sources
- Fact Sheet 23: Overtime Pay Requirements of the FLSA, U.S. Department of Labor
- Module 5, Designing Work Schedules (Continued), NIOSH Training for Nurses on Shift Work and Long Work Hours, CDC
Related guides
- How to Make an Employee Schedule: 6 Steps, Sample Week
- Weekly Shift Schedule Template: Free Grid to Print
- 3 On 3 Off Schedule: How the 6 Day Cycle Works
- 6 On 3 Off Schedule: A 9 Day Cycle Explained
Try ShiftGarden to put your week on one page.