What is a 4 on 3 off schedule?

By Al Davies ยท Updated November 11, 2026

Short answer: A 4 on 3 off schedule means a worker is on for four days, then off for three. Because 4 plus 3 is 7, the pattern repeats each week on the same days, so it is a fixed week, not a rotation.

What does one week look like?

DayMonTueWedThuFriSatSun
Crew AOnOnOnOnOffOffOff
Crew BOffOffOffOffOnOnOn

Crew A takes the front of the week and Crew B takes the weekend. Nothing shifts, so each person always knows which days are theirs.

How many hours is that?

Shift lengthFour shiftsOver 40?
8 hours32 hoursNo
10 hours40 hoursNo, exactly 40
12 hours48 hoursYes, 8 hours

Federal overtime, per the Department of Labor, is time and a half on each hour past 40 in one workweek. That workweek may start on any day, so it need not line up with the calendar week. With 12 hour shifts, each week carries 8 overtime hours.

Why does the 4 on 3 off pattern not need a cycle chart?

Longer patterns such as the 4 on 4 off schedule run on an 8 day cycle that drifts across the calendar. This one has 7 days, so it lines up with the week. That makes it easy to post, but it also means the same days are always thin.

What is the weak spot?

Two crews give you exactly one crew on every day, with no overlap. Monday to Thursday has Crew A alone and Friday to Sunday has Crew B alone. If you need two crews on at once, add a third group on an offset.

With a third crew that starts two days after the one before it, five of the seven days have two crews on and the other two days have one.

How do you post it?

Put crew names on one page, with the on days shaded. Print the week by role with your events and a QR code. Printing also posts it to your team. A four day week with 10 hour days is the same pattern as the 4/10 work schedule, so the page you build for one fits the other.

A few states count daily overtime too. This is general information, so ask your state labor department about daily rules.

FAQ

Is 4 on 3 off the same as a 4/10?

It is the same shape if the shifts are 10 hours. The name 4 on 3 off just does not say how long the shifts are.

Does it rotate?

No. The 7 day pattern lands on the same weekdays each week.

Do 12 hour shifts create overtime?

Four 12 hour shifts total 48 hours, which is 8 hours over 40.

How many crews cover a 7 day week?

Two crews split the week in the grid above. A single crew covering days needs a second group on the other days.

Sources

Try ShiftGarden to put your week on one page.