How do you make a construction crew schedule?

By Al Davies ยท Updated November 11, 2026

Short answer: Write each job site, the crew it needs and the start time, then assign people so no one is on two sites at once. Add a weather plan and check each person's weekly hours before you post.

What gets decided first?

  1. List each job and its dates.
  2. Write the crew size and skills each job needs.
  3. Set the start time and the yard or site meeting spot.
  4. Assign leads first, then crew.
  5. Add the tool and truck each crew needs.
  6. Mark the weather backup job.
  7. Check hours for each person.
  8. Post the week.

What does a week look like?

CrewMonTueWedThuFri
Crew 1, framingSite ASite ASite ASite ASite B
Crew 2, finishSite CSite CSite BSite BSite B
Weather backupShopShopShopShopShop

Sites and dates are samples. Use your own jobs.

Does travel between sites count?

DOL Fact Sheet 22 says time spent in travel as part of the principal activity, such as "travel from job site to job site during the workday," is work time and must be counted as hours worked. Ordinary home to work travel is not work time. If a crew moves between Site B and Site C, put the drive time on the schedule.

How do you track weekly hours?

Overtime starts after 40 hours in a workweek, which the Department of Labor defines as a fixed repeating 168 hour period. Add up each person's hours across jobs before you post, since a short change on Friday may push someone over.

How do you plan for weather?

Pick a backup task for each crew, such as shop work or a covered job, and put it on the schedule header. A weather call at 5 a.m. is easier when everyone knows where they go.

How do crews get the plan?

Print the week by role with your events and a QR code. Printing also posts it to your team. Crew leads can start from the employee schedule guide or print the weekly shift schedule template.

Not legal advice. Prevailing wage and local rules can apply on some jobs, so ask your state labor office.

FAQ

How do I schedule a crew with two sites in one day?

List both sites, the move time between them and who drives.

Is drive time paid?

Ordinary home to work travel is not. Driving from job site to job site during the workday is, per Fact Sheet 22.

What if rain cancels the day?

Use the backup job on the schedule, or send people home and tell them early.

Who leads when the foreman is out?

Name a second lead on the week so the crew is not left without one.