How do you make a warehouse employee schedule?
By Al Davies ยท Updated November 11, 2026
Short answer: Split the building into work areas, set the minimum number of people each area needs on each shift, and fill those spots with named workers. Then plan the extra hours for peak days and watch each person's total against 40 hours.
What do you do first?
- List the shifts you run and their start and end times.
- List the work areas: receiving, putaway, picking, packing, shipping.
- Write the minimum headcount for each area on each shift.
- Add the roles that need a trained person, like a forklift driver.
- Collect time off and availability by one fixed day.
- Fill each spot, then count every area against its minimum.
- Add backups for the spots that cannot sit empty.
What does a shift plan look like?
| Area | First shift | Second shift |
|---|---|---|
| Receiving | 3 people | 1 person |
| Picking | 6 people | 6 people |
| Packing | 4 people | 4 people |
| Shipping | 2 people | 3 people |
These are sample counts. Your own numbers come from your own volume. The point is that each area has a headcount on each shift, so a gap is easy to see.
How do you plan for peak days?
Trucks and orders do not arrive evenly. Mark the days that run heavy, like the day after a holiday, and add people to the areas that fill up first. Offer the extra shifts to people who asked for hours before you hire.
Post peak weeks early, so people can plan around them.
How do you track overtime?
Under federal wage rules, a covered worker who is not exempt earns at least one and one half times the regular rate for each hour past 40 in a workweek. A workweek is a fixed 168 hours, and two weeks are never averaged together.
So a person with 44 hours in one week and 36 the next is still owed overtime for 4 hours. Tally every person's week while you build the grid, not after payroll.
What about rest and shift changes?
Per NIOSH, part of the CDC, a start at 6 a.m. or earlier tends to cut sleep short. A late finish with an early restart the next morning leaves too little time off, so check for that pair before you post.
Plan the rest of a long shift on the grid, too.
How do you get it to the floor?
Print the week by role with your events and a QR code. Printing also posts it to your team.
The base grid is in the employee schedule guide; fill in a copy of the weekly shift schedule template.
FAQ
How many people does a warehouse shift need?
It depends on the work areas and your volume. Set a minimum for each area, then add for peak days.
How do you schedule warehouse overtime?
Add up hours against 40 for each workweek while you build the grid, and offer extra shifts fairly.
Can warehouse staff work different shifts each week?
Yes. Leave 11 hours or more between shifts, the gap NIOSH cites, and avoid sudden swings.
Should a warehouse schedule list jobs or people?
Both. List the areas and headcount, then fill each spot with a name.
Sources
- Fact Sheet 23: Overtime Pay Requirements of the FLSA, U.S. Department of Labor
- Module 5, Work Organization Strategies, guidelines (continued), NIOSH, CDC
Related guides
- How to Make an Employee Schedule: 6 Steps, Sample Week
- Weekly Shift Schedule Template: Free Grid to Print
- San Francisco Formula Retail Employee Rights Ordinance
- How to Make a Call Center Schedule That Fits the Calls
Try ShiftGarden to put your week on one page.