How do you make a landscaping crew schedule?

By Al Davies ยท Updated November 11, 2026

Short answer: List your jobs for the week, set crews with a lead and a truck, and assign each crew a route of stops that are close together. Then add a plan for rain, since weather moves landscaping more than most trades.

What are the steps?

  1. List the week's jobs with site, length and any equipment needed.
  2. Form crews, each with a lead, a truck and the tools it needs.
  3. Group nearby jobs into one route for each crew.
  4. Give each crew a start time at the yard and an end target.
  5. Set a rain plan: which jobs move, which crews do shop work.
  6. Set one cutoff for time off and availability requests.
  7. Post each crew's route and send changes the night before.

What does one crew's day look like?

6:30 AM: load at the yard, Truck 2
7:15 AM-10:00 AM: Site A, mow and edge
10:15 AM-12:30 PM: Site B, mulch
1:00-3:30 PM: Site C, trim
4:00 PM: return and unload

Include drive time. The truck is part of the schedule.

Who goes on which crew?

RoleJobPlan for it
Crew leadRuns the site, checks qualityKeep the same lead with the same crew
Crew memberMowing, trimming, plantingRotate tasks to cut strain
Equipment operatorSkid steer, mowerCheck who is trained for what

What is the rain plan?

Keep a short list of indoor or shop work, such as repair and sharpening, for rain days. Tell crews by a set hour the night before whether the day is on. Building crews plan for weather the same way, and the construction crew schedule adds site-to-site travel.

If crews wait at the yard for a go call, that time may be paid. Federal guidance says it turns on the facts, so ask your state agency if you are unsure.

How do you share routes?

A simple weekly page with each crew and its stops works well. Try our weekly shift schedule template, then follow the core steps in our employee scheduling guide.

Crew leads want routes, not a long list. Print the week by role with your events and a QR code. Printing also posts it to your team. Each truck then carries its own stops.

FAQ

How many people go on a landscaping crew?

It depends on the work. Use a lead plus enough hands to finish a site in the time you promised.

What do you do on a rain day?

Move jobs, or switch crews to shop work, and tell them the night before.

How do I cut drive time?

Group sites by area and give each crew a route.

Should seasons change the schedule?

Yes. Spring and fall bring more work, so build longer weeks early and plan time off for slow months.

Sources