What is the Panama shift schedule?
By Al Davies ยท Updated November 9, 2026
Short answer: Panama is a 12-hour, 2-2-3 shift plan, and many sources use Panama and Pitman as two names for it. When people do tell them apart, Panama means the crews rotate between day and night shifts. The full 2-2-3 count is in the Pitman guide. This page covers only the rotating part.
What does a rotating Panama grid look like?
| Week | Mon | Tue | Wed | Thu | Fri | Sat | Sun | Hours |
|---|---|---|---|---|---|---|---|---|
| Week 1 | Day | Day | Off | Off | Day | Day | Day | 60 |
| Week 2 | Off | Off | Day | Day | Off | Off | Off | 24 |
| Week 3 | Night | Night | Off | Off | Night | Night | Night | 60 |
| Week 4 | Off | Off | Night | Night | Off | Off | Off | 24 |
This is Crew A over 28 days. It keeps the same 2-2-3 rhythm, but spends two weeks on days and then two weeks on nights. Crew B works the days Crew A is off. Crews C and D start on nights while A and B are on days, then they trade.
This is one common way to rotate. Some shops switch more or less often, so write your own switch weeks on the posted grid.
How much rest comes before each switch?
Day to night: last day shift ends Thursday 6 p.m. in Week 2. First night shift starts Monday 6 p.m. in Week 3. Rest: 4 days.
Night to day: last night shift ends Friday 6 a.m. in Week 4. First day shift starts Monday 6 a.m. in Week 1. Rest: 3 days.
Hours in 28 days: 60 + 24 + 60 + 24 = 168, the same as a fixed crew.
Put each switch right after a long break, as this grid does. A switch in the middle of a run of shifts leaves almost no time to reset sleep.
How does rotating affect sleep?
NIOSH, part of the CDC, says moving forward, from day to evening to night, is easier on the body than moving backward. A move from nights back to days is a backward step, so watch how crews feel on the first day shift after nights.
NIOSH also says rotating plans should limit nights in a row, and that a run of three 12 hour shifts may call for 2 days of rest after it. This grid has at most three nights in a row, and two or more days off after each run. Our rotating shift guide covers direction and speed.
Does rotating change overtime?
No. A rotating crew still has a 60 hour week and a 24 hour week. Federal rules look at each workweek alone, so the 60 hour week still has 20 overtime hours for most hourly staff. The overtime guide shows the math.
How do you post a rotating grid?
Give each crew a letter, shade the night weeks, and write the date each switch happens. The no-app posting guide has simple places to put it. To see crews and weekly totals together, try ShiftGarden.
FAQ
Is the Panama schedule the same as Pitman?
Often, yes. Plenty of guides treat the two names as one 2-2-3 plan. A few keep Panama for crews that swap day and night work.
What does 2-2-3 mean?
It is the work rhythm over 14 days: 2 shifts on, 2 off, 3 on, then 2 off, 2 on, 3 off.
Do Panama crews work nights?
Yes, in the rotating version each crew spends part of the cycle on nights. In this sample, that is Weeks 3 and 4.
How many hours is the Panama schedule?
It averages 42 hours a week, with real weeks of 60 and 24.
How many crews does Panama need?
Four for round the clock cover, so one crew covers each day and one each night.
Sources
- Fact Sheet 23: Overtime Pay Requirements of the FLSA, U.S. Department of Labor
- Module 5, Designing Work Schedules (Continued), NIOSH Training for Nurses on Shift Work and Long Work Hours, CDC
- Module 5, Designing Work Schedules (Continued), NIOSH Training for Nurses on Shift Work and Long Work Hours, CDC
Related guides
- Pitman Shift Schedule: The 14-Day 12-Hour Grid
- Rotating Shift Schedule: Forward, Backward, Fast, Slow
- Double Time vs Time and a Half: What a Schedule Triggers
- How to Share a Work Schedule With Employees Without an App
- 12-Hour Shift Schedules: 2-2-3, DuPont and 4 on 4 off
- DuPont Shift Schedule: The 4-Week 12-Hour Grid, Counted
Try ShiftGarden to put your week on one page.