What are the common 12-hour shift schedules?

By Al Davies ยท Updated November 9, 2026

Short answer: The common 12-hour schedules are 2-2-3 (Pitman and Panama), DuPont, 4 on 4 off and 3 on 3 off. Each averages 42 hours a week, but the real weeks swing from zero to 72. Pick by days off, longest run and how often workers change between days and nights.

How do the 12-hour patterns compare?

PatternCycleShifts in a cycleHours in a cycleLongest run of shiftsLongest breakAverage week
2-2-314 days78433 days42
DuPont28 days1416847 days42
4 on 4 off8 days44844 days42
3 on 3 off6 days33633 days42

Row by row, the math is the same. For 4 on 4 off, 4 shifts times 12 is 48 hours in 8 days, and 48 divided by 8 times 7 is 42. For 3 on 3 off, 36 divided by 6 times 7 is 42. All four reach the same average by different paths. The University of Tennessee's MTAS police guide calls 4 on 4 off the most common 12-hour schedule and lists the Pittman schedule as 2-2-3.

One cycle of four 12-hour patterns on one scale: 2-2-3 is 14 days, DuPont 28 days, 4 on 4 off 8 days, 3 on 3 off 6 days. All average 42 hours a week.
Four patterns, one average, very different weeks.

What does each pattern feel like?

2-2-3 has short runs and a free weekend every other week. The Pitman guide shows the fixed-crew grid and the Panama guide shows a printable 2-week version. The names are used loosely, so check which one your team means.

DuPont gives one full week off in every four. It also has a 72 hour week. The DuPont guide has the full 28-day grid.

4 on 4 off is easy to read, but four 12 hour shifts in a row is the longest run on this page. 3 on 3 off has shorter runs and more frequent breaks.

Which weeks pay overtime?

PatternWeek hours seenWeeks over 40
2-2-360 and 24The 60 hour week
DuPont48, 72, 48 and 0The 48, 72 and 48 hour weeks
4 on 4 offVaries by week, 36 to 48Weeks with 4 shifts
3 on 3 offVaries by week, 36 to 48Weeks with 4 shifts

Federal pay rules look at one workweek at a time, so a 42 hour average still leaves overtime in the long weeks. For most hourly staff, each hour past 40 in that week is paid at time and a half.

In 4 on 4 off, a week with 4 shifts is 48 hours, so 8 are over 40. A week with 3 shifts is 36.

California adds a daily rule. Hours past 8 in a workday earn time and a half, and hours past 12 earn double time, so each 12-hour shift there has 4 daily overtime hours unless an approved alternative workweek changes the line. The overtime guide covers both rules. Other states may have their own daily rules.

How should you choose?

The CDC's NIOSH training says no one schedule design can be called best. Two of its checks fit any pattern here: leave 11 or more hours from the end of one shift to the start of the next, and plan 2 rest days once a worker has done three 12 hour shifts back to back.

What goes wrong with 12-hour schedules?

Most problems come from the long weeks. A 60 or 72 hour week is a real cost in pay and in tired people, even when the average looks fine. Count the highest week before you pick a pattern.

The second problem is the switch between nights and days. DuPont does it inside one cycle. 2-2-3 can do it if crews rotate. If you can keep crews fixed, the switching problem goes away, but the fixed night crew has its own cost.

The third problem is cover. With 12-hour shifts, one missed shift is a whole half day. Keep a written cover order, and add each cover to the worker's week before you approve it.

What should you print before you pick?

Print the grid for each pattern you are weighing and put the weekly hours next to each row. Show them to the people who will work it. They will see the long runs and the long weeks faster than a table of numbers shows them.

Then write down the one thing you most need to protect, such as a free weekend or a full week off. The pattern that protects it is usually the right start.

How do you roll out a new pattern?

Run the new grid on paper for one full cycle before you switch. Count each person's hours by week, and mark any week over 40. If a week looks wrong on paper, it will feel worse in real life.

Tell the team the start date at least one full cycle ahead. Post the grid where everyone can see it. After the first cycle, ask three questions: which week was hardest, which break helped most, and what would they change. Write the answers down. Change one thing at a time, so you can tell what helped.

Keep one more number in view: the share of weekends each pattern gives. 2-2-3 gives every other weekend. DuPont gives one full week off in every 28 days. Ask your team which matters more, weekends or longer breaks, before you choose.

Where do you keep the grid?

Whatever you pick, post the crew letters and the start date in one place. Our guide on sharing a schedule without an app shows simple ways to do it. If you want shifts, swaps and weekly hours together, look at ShiftGarden.

FAQ

How many hours a week is a 12-hour shift schedule?

The common patterns average 42 hours a week. Single weeks range from 0 to 72.

What is the best 12-hour shift schedule?

There is no single best one. NIOSH says no one design can be recommended above the rest. Compare days off, longest run and overtime.

Do 12-hour shifts mean overtime?

Often. The federal rule pays time and a half past 40 hours in one workweek, and long weeks cross it. In California, hours past 8 in one day count too.

How many crews do I need for 24 hour cover?

Four for each pattern on this page: two crews on days and two on nights. One crew alone covers only 12 hours.

Which pattern gives a full week off?

DuPont, with 7 days off in a row in every 28 days.

Sources

Try ShiftGarden to put your week on one page.